Home / Search results 18
Choose filters
Cancel
Validate
Choose filters
Validate
Validate
Validate
- Rough plumbing
Shower, toilet, and sink drains; drain from upstairs repaired - So it turns out when the previous owners put in the upstairs bath, the plumbing for the sink was not exactly up to code: they reused the old vent pipe for the old downstairs bath as the drain for the new. It's fixed now. - Before
The obligatory "before" shot - The obligatory "before" shot - Empty
We've removed most everything that's not nailed down - We've removed most everything that's not nailed down - Gutted
Bathroom is down to studs. - It seems so small now that it's empty. There was both wood paneling and plaster with metal lath on the walls & ceiling, so overall once the walls are back up, we've probably gained an inch in both dimensions. - Rough framing
Floor, closet, and shower rough framing are in - Floor, closet, and shower rough framing are in - Electrical rough-in
Not a whole lot to see: ceiling fan/light, couple of electrical boxes. Note on left wall pointing to leak in upstairs bath drain. - Not a whole lot to see: ceiling fan/light, couple of electrical boxes. Note on left wall pointing to leak in upstairs sink drain pipe. - Rough plumbing II
Rough supply-side plumbing is done as well - Rough supply-side plumbing is done as well - Wallboard!
Blueboard and concrete backer board are up! - Blueboard and concrete backer board are up! We placed a time capsule inside the wall on the left. - Plaster
Plaster is up. Starting to look more finished! - Plaster is up. Starting to look more finished! - Walls tiled!
Wall tile is up, both shower and vanity. - Wall tile is up, both shower and vanity. - Floor tiled too
All the tile is in, awaiting grout - All the tile is in, awaiting grout - Grout
Tiles are grouted - Tiles are grouted - Finish carpentry
Vanity & toilet topper are in; door and window are trimmed; mirror, light bracket, and closet passthru - Vanity & toilet topper are in; door and window are trimmed; mirror, light bracket, and closet passthru - Paint
First coat of paint is on. Woodwork is stained. Vanity top awaits fixtures. - First coat of paint is on. Woodwork is stained. Vanity top awaits fixtures. - Plumbing done!
Shower valve, sink fixture, and toilet (not visible); ceiling is painted. - Shower valve, sink fixture, and toilet (not visible); ceiling is painted. - Small items
2nd coat of paint; some accessories installed; litterbox is finally back out of the hall. Just awaiting final electric and shower glass. - 2nd coat of paint; some accessories installed; litterbox is finally back out of the hall. Just awaiting final electric and shower glass.