- What we've all been waiting for
Indoor plumbing! Woo hoo! Of course the shop light is still the only light. - Walls tiled!
Wall tile is up, both shower and vanity. - Wall tile is up, both shower and vanity. - Wallboard!
Blueboard and concrete backer board are up! - Blueboard and concrete backer board are up! We placed a time capsule inside the wall on the left. - Vanity top construction
Fiberglass backing and embedded steel bars reinforce the stone; clips attach the undermount sink - Vanity top
Vanity top is done! Red marble will match floor tiles nicely. - Trimmed in window
Tile had to be cut back to make room for woodwork - Time capsule
Lis puts the new time capsule into the wall - Tiled shower walls!
- Small items
2nd coat of paint; some accessories installed; litterbox is finally back out of the hall. Just awaiting final electric and shower glass. - 2nd coat of paint; some accessories installed; litterbox is finally back out of the hall. Just awaiting final electric and shower glass. - Shower roughed in
Copper pan and supply pipes are in place - Shower mudded in
Shower base is poured; concrete backer board is in place. - Shower enclosure
The glass shower enclosure is finally installed -- and with that, the project is done. - The glass shower enclosure is finally installed -- and with that, the project is done. - Rough plumbing II
Rough supply-side plumbing is done as well - Rough supply-side plumbing is done as well - Rough framing
Floor, closet, and shower rough framing are in - Floor, closet, and shower rough framing are in - Plumbing done!
Shower valve, sink fixture, and toilet (not visible); ceiling is painted. - Shower valve, sink fixture, and toilet (not visible); ceiling is painted. - Plaster
Wall construction was early skimcoat plaster; some use of metal lath (not shown) - Wall construction is an early skimcoat plaster, using "rock lath": 16" strips of drywall; some use of metal lath (not shown); followed by a full plaster layer and topcoat.