- Time capsule
Lis puts the new time capsule into the wall - Old and new
Newspapers for the new time capsule - Closet
Wallboard is up in the closet too - Shower mudded in
Shower base is poured; concrete backer board is in place. - Wallboard!
Blueboard and concrete backer board are up! - Blueboard and concrete backer board are up! We placed a time capsule inside the wall on the left. - Shower roughed in
Copper pan and supply pipes are in place - Rough plumbing II
Rough supply-side plumbing is done as well - Rough supply-side plumbing is done as well - Basement plumbing
There's now no iron drainpipe in the entire house, except the short run to the kitchen sink. - Sorry this is slightly blurry. - Drains & copper pan
Here you can see the toilet and shower drains, and the copper pan for the shower. Also on the right the drain and vent pipes to bring upstairs back to code. - Sorry this is slightly blurry. - Insulation
The outside wall is insulated - Vanity top construction
Fiberglass backing and embedded steel bars reinforce the stone; clips attach the undermount sink - Vanity top
Vanity top is done! Red marble will match floor tiles nicely. - Matching shower shelf
This piece of marble has an embedded fossilized tree branch - Framing under shower
Reframing floor joists to make room for the shower drain - Electrical rough-in
Not a whole lot to see: ceiling fan/light, couple of electrical boxes. Note on left wall pointing to leak in upstairs bath drain. - Not a whole lot to see: ceiling fan/light, couple of electrical boxes. Note on left wall pointing to leak in upstairs sink drain pipe.