- Floor tiled too
All the tile is in, awaiting grout - All the tile is in, awaiting grout - Paint
First coat of paint is on. Woodwork is stained. Vanity top awaits fixtures. - First coat of paint is on. Woodwork is stained. Vanity top awaits fixtures. - Shower enclosure
The glass shower enclosure is finally installed -- and with that, the project is done. - The glass shower enclosure is finally installed -- and with that, the project is done. - Walls tiled!
Wall tile is up, both shower and vanity. - Wall tile is up, both shower and vanity. - Grout
Tiles are grouted - Tiles are grouted - Small items
2nd coat of paint; some accessories installed; litterbox is finally back out of the hall. Just awaiting final electric and shower glass. - 2nd coat of paint; some accessories installed; litterbox is finally back out of the hall. Just awaiting final electric and shower glass. - Lights!
Lights and fan are installed and operational. (The funny glow coming from the sink is just me playing with my flash.) - Lights and fan are installed and operational. (The funny glow coming from the sink is just me playing with my flash.) - Plumbing done!
Shower valve, sink fixture, and toilet (not visible); ceiling is painted. - Shower valve, sink fixture, and toilet (not visible); ceiling is painted. - Plaster
Plaster is up. Starting to look more finished! - Plaster is up. Starting to look more finished! - Finish carpentry
Vanity & toilet topper are in; door and window are trimmed; mirror, light bracket, and closet passthru - Vanity & toilet topper are in; door and window are trimmed; mirror, light bracket, and closet passthru - Wallboard!
Blueboard and concrete backer board are up! - Blueboard and concrete backer board are up! We placed a time capsule inside the wall on the left. - Rough framing
Floor, closet, and shower rough framing are in - Floor, closet, and shower rough framing are in - Before
The obligatory "before" shot - The obligatory "before" shot - Rough plumbing II
Rough supply-side plumbing is done as well - Rough supply-side plumbing is done as well - Electrical rough-in
Not a whole lot to see: ceiling fan/light, couple of electrical boxes. Note on left wall pointing to leak in upstairs bath drain. - Not a whole lot to see: ceiling fan/light, couple of electrical boxes. Note on left wall pointing to leak in upstairs sink drain pipe. - Empty
We've removed most everything that's not nailed down - We've removed most everything that's not nailed down